Workability evaluation device - List of Manufacturers, Suppliers, Companies and Products

Workability evaluation device Product List

1~1 item / All 1 items

Displayed results

J Ring Flow Test

Evaluating gap permeability! Introducing the workability evaluation criteria for high-flow concrete.

The "J Ring Flow Test" is an evaluation method for the workability (material separation resistance, fluidity, and gap passing ability) required for high fluidity concrete using high-performance AE water-reducing agents containing thickening agents, with a target slump flow of 500 mm or more. By installing a J ring in the conventional slump flow test, the gap passing ability is evaluated based on the obstacles provided by the J ring. 【Evaluation Contents】 ■ Material Separation Resistance ■ Fluidity ■ Gap Passing Ability *For more details, please refer to the PDF document or feel free to contact us.

  • Surveying

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration